June 03 11   Stenciled no diving,jumping depth's around pool Pool   Stencil in pool area 11 June 03
June 03 11   Caulked cap on fire wall and bathroom vent installed flashing 50 280 H/O reported that the window in the upstairs bedroom is leaking.pls inspect the cause and advise asap 10 June 03
June 03 14   Inspected 6-11 water damaged sheetrock from window leak. HO stated that this has been a problem since the siding was changed. Lisa is going to contact the contractor who installed the siding to see if water is entering from improper waterproofing under the siding. If not the HO is responsible for the waterproofing of her newly installed windows. 76 279 Window in front is taking in a tremdous amount of water pls inspect the cause and advise asap 9 June 03
June 03 4   Fence repaired Grounds 262 Pls repair fences at dumpster corrals near bldg 1 & 2(near 22 PL) 29 Apr 03
June 03 11   Removed old cement on rear steps and patched where peeling 5 248 Parging on rear steps is peeling,pls inspect and see if it can be repaired.DO NOT REPARGE ENITRE STAIRCASE-BOARD DECISION 14 Apr 03
June 03 4   Roof is ok, cemented hole in staircase 137 259 Front cement staircase-hole in bottom step pls repair,check roof of 137 & 139 h/o found shingle in flower bed 29 Apr 03
June 03 25   fixed steps with cement 69 & 5   check cement    
June 03 11   Refaced side and steps 69 269 Cement facing on back porches on 69 & 71 is crumbling pls inspect and advise concerning repair 1 May 03
June 03 4   Completed 114 278 Birds in front door overhang lifted shingles. Correct shingles and make it so birds cant nest 28 May 03
June 03 4   Replaced missing shingles Building 2   Needs shingles 28 May 03
June 03 4   Replaced senor Building 12   Needs sencer 28 May 03
June 03 4   Repaired leader 118   Front left. Repair liter 28 May 03
June 03 25   Installed flashing 71 288 H/O reports that no flashing was installed above basement window.pls inspect and advise 17 June 03
June 03 18   Inspected 6-11 4 rotted window sills, water stains on the wall HO stated that this has been a problem since the siding was changed. Siding contractor is going to repair if leak is caused by improper waterproofing 48 281 H/O reported water leak from above 2 windows in the bedroom and the 2 windows in the back, pls inspect the cause and advise asap 10 June 03
        123 287 Pls schedule waterproofing of this basement with h/o 17 June 03
June 03 25   Cleaned out gutters, leaders & downspouts. Patched parra pit wall w/ cement 110 286 H/O reports that gutters are overflowing, thus allowing water to enter basement, if gutters are clogged pls clean, pls advise asap 17 June 03
June 03 18   Removed nest & resecured loose roof shingles 148 285 H/O reports roof is leaking. Pls inspect and advise 17 June 03
June 03 18   Resecured gutter 107 284 Owner reported that the elbow to the gutter / downspout is loose and causing water to drain against the unit 16 June 03
June 03 18   Inspected & found no missing moulding 143 173   Nov 02  
June 03 25   Replaced and painted sill 41 290 Door sill needs to be replaced due to termite damage pls repair asap 20 June 03
June 03 25   Seperated trash and recycling Dumpster 293 Pls. Remove trash from recycling dumpster & advise when finished so Lisa could schedule pick up 24 June 03
July 03 2   Replaced flood lights 133 291 3 flood lights on pole are out, pls replace and make sure the fixtures are working 23 June 03
        150 292 Water leak in basement when raining. Pls inspect and report necessary repairs 24 June 03
      Sent proposal 1/7/03 104 190 Grading problem in the rear of the unit. Ground is pitched toward unit & water is coming into basement. Has proposal 1/7/03 10 Dec 02
      Inspected 1-22-03 sent proposal 119   Basement leak. Install sump pump and french drain and water proof as per engenier. WANTS BID ASAP 17 Dec 02
      Inspected 1-22-03 sent proposal 102   Waterproof the unit as per engeniers report. WANTS BID ASAP 17 Dec 02
July 03 2   Repaired 6 299 Cement steps need to be repaired, pls repair 27 June 03
July 03 2   Installed 3 shingles & caulked window 26   Bedroom leak 27 June 03
July 03 2   Replaced top soil 5 297 Pls replace eroded topsoil under deck 26 June 03
July 03 2   Found gutter to be okay 107 295 Pls inspect gutter and repair if necessasy 26 June 03
July 03 2   Installed glass 32   Missing glass to light fixture,glass in shed 27 June 03
July 03 9   Completed Pool 303 Pls make sure the garbage can located in pool area is emptied when you are on site 9 July 03
July 03 9   Flashed vent pipes 6-18. 4" cap installed 7/9 105 289 Leak from vent pipe repair 17 June 03
July 03 9   All painting of trim completed Building 3   Paint trim   June 03
July 03 11   completed Grounds 311 Pls clean areas around dumpsters. There are several propane tanks that need to be removed from those areas 11 July 03
July 03 11   completed Grounds 308 Pls check dumpster that was not emptied. I believe garbage was put in with the recyclables. 10 July 03