| Primrose Work Orders 2003 | ||||||||
| Completed | Received | |||||||
| Month Year | Day | Billed | Completed Description | Unit # | Ticket # | W.O. Description | Day | Month/Year |
| June 03 | 11 | Stenciled no diving,jumping depth's around pool | Pool | Stencil in pool area | 11 | June 03 | ||
| June 03 | 11 | Caulked cap on fire wall and bathroom vent installed flashing | 50 | 280 | H/O reported that the window in the upstairs bedroom is leaking.pls inspect the cause and advise asap | 10 | June 03 | |
| June 03 | 14 | Inspected 6-11 water damaged sheetrock from window leak. HO stated that this has been a problem since the siding was changed. Lisa is going to contact the contractor who installed the siding to see if water is entering from improper waterproofing under the siding. If not the HO is responsible for the waterproofing of her newly installed windows. | 76 | 279 | Window in front is taking in a tremdous amount of water pls inspect the cause and advise asap | 9 | June 03 | |
| June 03 | 4 | Fence repaired | Grounds | 262 | Pls repair fences at dumpster corrals near bldg 1 & 2(near 22 PL) | 29 | Apr 03 | |
| June 03 | 11 | Removed old cement on rear steps and patched where peeling | 5 | 248 | Parging on rear steps is peeling,pls inspect and see if it can be repaired.DO NOT REPARGE ENITRE STAIRCASE-BOARD DECISION | 14 | Apr 03 | |
| June 03 | 4 | Roof is ok, cemented hole in staircase | 137 | 259 | Front cement staircase-hole in bottom step pls repair,check roof of 137 & 139 h/o found shingle in flower bed | 29 | Apr 03 | |
| June 03 | 25 | fixed steps with cement | 69 & 5 | check cement | ||||
| June 03 | 11 | Refaced side and steps | 69 | 269 | Cement facing on back porches on 69 & 71 is crumbling pls inspect and advise concerning repair | 1 | May 03 | |
| June 03 | 4 | Completed | 114 | 278 | Birds in front door overhang lifted shingles. Correct shingles and make it so birds cant nest | 28 | May 03 | |
| June 03 | 4 | Replaced missing shingles | Building 2 | Needs shingles | 28 | May 03 | ||
| June 03 | 4 | Replaced senor | Building 12 | Needs sencer | 28 | May 03 | ||
| June 03 | 4 | Repaired leader | 118 | Front left. Repair liter | 28 | May 03 | ||
| June 03 | 25 | Installed flashing | 71 | 288 | H/O reports that no flashing was installed above basement window.pls inspect and advise | 17 | June 03 | |
| June 03 | 18 | Inspected 6-11 4 rotted window sills, water stains on the wall HO stated that this has been a problem since the siding was changed. Siding contractor is going to repair if leak is caused by improper waterproofing | 48 | 281 | H/O reported water leak from above 2 windows in the bedroom and the 2 windows in the back, pls inspect the cause and advise asap | 10 | June 03 | |
| 123 | 287 | Pls schedule waterproofing of this basement with h/o | 17 | June 03 | ||||
| June 03 | 25 | Cleaned out gutters, leaders & downspouts. Patched parra pit wall w/ cement | 110 | 286 | H/O reports that gutters are overflowing, thus allowing water to enter basement, if gutters are clogged pls clean, pls advise asap | 17 | June 03 | |
| June 03 | 18 | Removed nest & resecured loose roof shingles | 148 | 285 | H/O reports roof is leaking. Pls inspect and advise | 17 | June 03 | |
| June 03 | 18 | Resecured gutter | 107 | 284 | Owner reported that the elbow to the gutter / downspout is loose and causing water to drain against the unit | 16 | June 03 | |
| June 03 | 18 | Inspected & found no missing moulding | 143 | 173 | Nov 02 | |||
| June 03 | 25 | Replaced and painted sill | 41 | 290 | Door sill needs to be replaced due to termite damage pls repair asap | 20 | June 03 | |
| June 03 | 25 | Seperated trash and recycling | Dumpster | 293 | Pls. Remove trash from recycling dumpster & advise when finished so Lisa could schedule pick up | 24 | June 03 | |
| July 03 | 2 | Replaced flood lights | 133 | 291 | 3 flood lights on pole are out, pls replace and make sure the fixtures are working | 23 | June 03 | |
| Inspected 7-16 and found water entering through foundation | 150 | 292 | Water leak in basement when raining. Pls inspect and report necessary repairs | 24 | June 03 | |||
| Sent proposal 1/7/03 | 104 | 190 | Grading problem in the rear of the unit. Ground is pitched toward unit & water is coming into basement. Has proposal 1/7/03 | 10 | Dec 02 | |||
| Inspected 1-22-03 sent proposal | 119 | Basement leak. Install sump pump and french drain and water proof as per engenier. WANTS BID ASAP | 17 | Dec 02 | ||||
| Inspected 1-22-03 sent proposal | 102 | Waterproof the unit as per engeniers report. WANTS BID ASAP | 17 | Dec 02 | ||||
| July 03 | 2 | Repaired | 6 | 299 | Cement steps need to be repaired, pls repair | 27 | June 03 | |
| July 03 | 2 | Installed 3 shingles & caulked window | 26 | Bedroom leak | 27 | June 03 | ||
| July 03 | 2 | Replaced top soil | 5 | 297 | Pls replace eroded topsoil under deck | 26 | June 03 | |
| July 03 | 2 | Found gutter to be okay | 107 | 295 | Pls inspect gutter and repair if necessasy | 26 | June 03 | |
| July 03 | 2 | Installed glass | 32 | Missing glass to light fixture,glass in shed | 27 | June 03 | ||
| July 03 | 9 | Completed | Pool | 303 | Pls make sure the garbage can located in pool area is emptied when you are on site | 9 | July 03 | |
| July 03 | 9 | Flashed vent pipes 6-18. 4" cap installed 7/9 | 105 | 289 | Leak from vent pipe repair | 17 | June 03 | |
| July 03 | 9 | All painting of trim completed | Building 3 | Paint trim | June 03 | |||
| July 03 | 11 | completed | Grounds | 311 | Pls clean areas around dumpsters. There are several propane tanks that need to be removed from those areas | 11 | July 03 | |
| July 03 | 11 | completed | Grounds | 308 | Pls check dumpster that was not emptied. I believe garbage was put in with the recyclables. | 10 | July 03 | |
| July 03 | 11 | completed | Grounds | 309 | Pls make sure to clean up broken glass near the basketball court and also broken glass in the street near bldg 12 | 10 | July 03 | |
| July 03 | 16 | Cleaned out and respiked gutters | 9 | Rear gutter is leaking. Pls inspect and repair if necessary | 10 | July 03 | ||
| July 03 | 16 | Cleaned out gutters | 115 | 310 | H/O reports that gutters need to be cleaned | 11 | July 03 | |
| July 03 | 16 | Caulked arounds basement windows | 97 | 294 | Pls inspect basement window and advise what problems are present | 26 | June 03 | |
| July 03 | 16 | Compounded damaged wall | 50 | Damaged wall from leak | July 03 | |||
| July 03 | 16 | Painted door homeowner purchased | 41 | 290 | Door sill needs to be replaced due to termite damage pls repair asap | 20 | June 03 | |
| July 03 | 16 | Removed flashing,caulked and replaced flashing | 18 | 304 | Unit being sold,home inspection indicated that the roof was leaking,pls inspect and make the necessary repairs to stop this leaking asap | 10 | July 03 | |
| July 03 | 16 | Inspected and found no termite damage | 18 | 306 | Home inspection discovered termite activity around the rear door frame,pls inspect the unit and advise to whether there is any damage that needs to be repaired and cost thereof asap | 10 | July 03 | |
| July 03 | 16 | Painted 2nd coat on wood trim | 73 & 75 | Paint wood trim between doors | 20 | Mar 03 | ||
| July 03 | 23 | Added more soil under deck and leveled it out away from foundation | 5 | 307 | H/O reports that when we replaced the top soil under the deck there wasn’t enough installed,pls inspect and correct the problem | 10 | July 03 | |
| 23 | Caulked around chimney cap and crack on wall | 40 | 313 | h/o reports that water leaks through bedroom window,pls inspect and repair if possible.pls advise where leak is coming from | 21 | July 03 | ||
| July 03 | 23 | Replaced attic fan that was damaged from fire. Can not replace glass | 40 | 296 | Pls replace attic fan and glass in window that was damaged in a fire | 26 | June 03 | |
| July 03 | 23 | Installed ten 6 foot fence supports | ||||||
| July 03 | 30 | Replaced broken glass on light fixture | 128 | Broken light fixture(Raymond called this in) | 30 | July 03 | ||
| July 03 | 30 | Painted all trim in back of bldg 5 | Bldg 5 | Trim in back of units need to be painted | ||||
| July 03 | 30 | Replaced the light bulb that was out on sign | Grounds | 314 | Pls replace light bulb by Primrose Lane sign in entrance way closest to Burnt Tavern Rd | 25 | July 03 |